Colorado fleet operators can get $5,000 to $150,000 per charging port through Fleet-ZERO
Colorado is paving the way for sustainable transportation. For businesses, local governments, schools, and nonprofits managing vehicle fleets, electrifying operations is no longer just a long-term sustainability goal—it’s an immediate financial and operational advantage. However, navigating the upfront costs of electric vehicle supply equipment (EVSE) and infrastructure upgrades can be a significant hurdle.
Enter the Colorado Energy Office (CEO) Fleet-ZERO Program. Backed by over $10 million in state and federal funds, this grant is designed specifically to offset the costs of deploying charging infrastructure for light-, medium-, and heavy-duty on- and off-road electric fleets.
Here is a breakdown of how the Fleet-ZERO program works, what funding is available, and how partnering with SWTCH can ensure your fleet charging deployment is a success. With the next major funding round closing in January 2027, now is the time to start planning your site and gathering your application materials.
What is Fleet-ZERO?
Fleet-ZERO (short for Fleet Zero-Emission Resource Opportunity) is the Colorado Energy Office’s grant for charging that serves fleet vehicles, from light-duty cars to heavy trucks, on-road or off. It used to be part of Charge Ahead Colorado and now runs as its own program, with $10 million or more in total funding.
Two things make it different from a typical rebate. The money is paid per port (one connector that charges one vehicle), and the amount depends on how powerful the charger is. It’s also a reimbursement: you pay for the project, finish it, and then claim the grant back.
Businesses, governments, nonprofits, schools, Tribal governments and entities, and independent contractors can all apply. So can fleet charging providers that own and operate their chargers, and transit agencies for their non-transit vehicles. Whoever applies has to be the organization that will own and operate the chargers.
It’s for fleet charging only
Fleet-ZERO covers private depot charging and charging shared between fleets. If a charger will mainly serve the public, employees, residents of a multifamily building, or a home, it belongs in Charge Ahead Colorado instead.
The two programs can’t pay for the same port, and neither can Fleet-ZERO and another state grant. One site can still use both, though: Fleet-ZERO for the depot ports and Charge Ahead for the ones the public uses. So before you apply, sort your planned ports by who will use them.
Three pathways
Fleet-ZERO has three lanes, and each one has its own limits.
Standard: the main competitive round
Most projects go through the Standard lane, which opens in scheduled rounds. The current round closes January 15, and the next one is planned for spring 2027. The Colorado Energy Office (CEO) puts the likely maximum award at $500,000 per organization per round, and you cover at least 20% of the cost yourself.
Rolling: smaller projects, all year
If you need $50,000 or less, the Rolling lane is open year-round. An organization can win up to three Rolling awards a year, and CEO aims to decide about 30 days after you apply. It pays the same per-port amounts as Standard. CEO can pause Rolling funding at any time, so don’t assume it will stay open.
M/HD Corridor: public truck charging on major routes
This lane funds public fast-charging sites for medium- and heavy-duty (M/HD) trucks. It pays $250,000 per port for 350 to 699 kW chargers and $400,000 per port for Megawatt Charging System (MCS) ports of 700 kW or more. CEO’s likely maximum is about $2 million per site, plus $100,000 for each pull-through stall beyond the first two and $100,000 for battery storage of at least 250 kWh. The money is federal, so federal rules apply, and the match is 20%.
The bar for a corridor site is high: at least 1.4 MW of new capacity, four public ports at 350 kW or more, two pull-through stalls, two CCS ports, one MCS port (or the groundwork to add one by December 31, 2031), lighting, restrooms, and access around the clock. Sites along the Denver Metro, Colorado Springs, and Fort Collins/Loveland corridors get priority. If your site can’t meet all of that, Standard or Rolling is the better fit.
How much each port gets
In the Standard and Rolling lanes, the most a port can receive depends on the charger’s power and on whether you qualify for one of three enhanced tiers. Each port can use one tier.
| Charger | Standard / Rolling | Qualifying Entity | Charging Hub | EBUS (school bus) |
| Level 2 (3 kW+) | $5,000 | $7,000 | $10,000 | $25,000 |
| DC fast charging under 50 kW | $7,500 | $10,000 | $12,500 | $50,000 |
| DC fast charging 50-99 kW | $25,000 | $30,000 | $35,000 | $75,000 |
| DC fast charging 100-349 kW | $35,000 | $40,000 | $50,000 | $100,000 |
| DC fast charging 350-699 kW | $70,000 | $85,000 | $100,000 | $100,000 |
| MCS 700 kW+ | $100,000 | $125,000 | $150,000 | $100,000 |
The enhanced tiers work like this:
- Qualifying Entity covers certified disadvantaged, minority-owned, small, veteran-owned, or women-owned businesses (DBE, MBE, SBE, VOSB, or WBE), along with government and public entities, nonprofits, schools, and Tribal governments. Upload proof of your status with the application, or the higher amount won’t be offered.
- Charging Hub is for charging that’s consistently available to three or more fleets. CEO holds back the payment until you show signed charging agreements with three or more fleets, or that the ports have been opened to the public.
- EBUS is for Colorado school districts and charter schools buying new or replacement school bus chargers.
These amounts are ceilings. CEO sets each award based on the charger, the number of ports, what you requested, the quality of your application, and how much budget is left.
Your share of the cost
Standard applicants pay at least 20% of net eligible costs. Most enhanced awards, which are state-funded, drop that to 10%, and so do new school bus chargers. Replacement school bus chargers need no match at all. Anyone awarded federal funds pays 20%.
Other incentives can’t count toward your match. Instead, they reduce the cost the grant is calculated on. At a 20% match, the $5,000 Level 2 cap is reached once a port’s net eligible cost hits $6,250, and the $35,000 cap for a 100-349 kW charger at $43,750.
What it pays for
The grant covers the chargers themselves, installation labor, materials, and site prep. It also covers utility-side and electrical upgrades like conduit, transformers, panels, and line extensions, along with engineering, permits, extra conduit for future chargers, networking fees, service agreements, and warranties.
It won’t pay for the vehicles, leased chargers, Level 1 chargers, electricity, maintenance, consultants, taxes, buildings or amenities like restrooms, or solar and battery storage (apart from the corridor battery adder).
Putting your application together
You apply through CEO’s online portal, and CEO offers a Word document for each lane so you can draft offline first. The application asks for your project type (single fleet, dual fleet, or charging hub), site details, how many vehicles you have and their weight classes, an estimated cost, a timeline, the barriers you face, and how you plan to operate and price the charging. Once the confirmation email arrives, your application is final. Email and paper applications aren’t accepted.
The only required upload is proof that you control each site, such as a deed, a lease, a signed contract, or a letter or MOU from the property owner. Correspondence with your utility or electrician (a will-serve letter or service notice, for example), vendor quotes, and permit status aren’t required, but they earn readiness points, so it’s worth collecting them before January 15. Leave out anything confidential like bank statements, since applications are subject to public records requests.
CEO scores applications out of 100 across eight categories. Application quality, project design, benefits, and equity and environmental justice carry the most weight, at 15 points each. If you have questions about the current round, send them through CEO’s Q&A form by December 4, 2026. CEO doesn’t answer questions one by one during a round; it posts the answers by 5:00 pm MT the following Friday.
What you’re signing up for
Fleet-ZERO is a five-year commitment. Your chargers have to stay in operation for at least five years from the day they’re energized, and you need to tell CEO within seven days if one goes down.
They also have to stay networked, meaning connected to software that records each charging session, for those five years. CEO needs either read-only access to your dashboard or quarterly data covering session IDs, start and end times, energy delivered, and each station’s address and coordinates. Single-fleet projects can use five years of telematics software instead. Networking fees are an eligible cost, so build all five years into your budget.
The equipment has to be UL, SAE, or ETL listed (or equivalent), meet NEC Article 625, be installed by a licensed and insured Colorado electrician, and carry at least a one-year warranty. You have to buy the chargers rather than lease them, with one EV-only parking space per port.
If the site is shared or open to employees or the public, at least 5% of ports, and at least one per site, need accessible design. Every dual-fleet, hub, and federally funded project needs it too.
Important note on timing and payment
Don’t buy equipment or start work until you have a signed agreement with CEO. Any costs from before that point, including work you’ve only contracted, aren’t eligible.
Award notices for the Standard and Corridor lanes go out about 60 days after the round closes. From there, you have 30 days to return the Acceptance and Orientation form and 45 days to approve the draft agreement.
You pay the full cost up front. CEO reimburses your net eligible costs, minus your match, once it accepts your final paperwork: invoices, proof of warranty and networking, proof that you own or lease the EVs, photos, and permits. CEO doesn’t say how long payment takes, so plan your cash flow around carrying the whole project. Nonprofits can be paid in advance.
How SWTCH Can Help You Maximize Your Grant
Deploying fleet charging involves more than just plugging in a station; it requires strategic planning, energy management, and reliable software. Here is how SWTCH can serve as your end-to-end partner for the Fleet-ZERO grant:
-
Intelligent Load Management: SWTCH’s energy management software dynamically distributes available power across your fleet chargers. This allows you to install more chargers on your existing electrical panel, helping you avoid costly and time-consuming utility upgrades.
-
Uptime and Reliability: Fleet vehicles need to be ready when the shift starts. SWTCH’s network operates with industry-leading uptime, backed by 24/7 support and proactive monitoring to ensure your vehicles are always charged and ready to roll.
-
Actionable Fleet Insights: SWTCH’s dashboard provides granular visibility into energy consumption, charging sessions, and cost metrics, allowing you to optimize your charging schedule to take advantage of off-peak utility rates.
-
Project and Application Support: We work closely with our clients and installation partners to design eligible, future-proof charging systems that align perfectly with the technical requirements of programs like Fleet-ZERO.
With over $10 million in state and federal funds available, there’s no better time than now to build your EV charging infrastructure. Reach out to the SWTCH team today to secure your funding before the January deadline.
FAQ
Can I use Fleet-ZERO for public charging?
Only through the M/HD Corridor lane, which funds public truck charging. Other public, workplace, multifamily, and home charging goes through Charge Ahead Colorado, and the two programs can’t fund the same port.
Does Fleet-ZERO pay before I build?
No. You pay for the project, and CEO reimburses you after it accepts your final paperwork. The exception is nonprofits, which can be paid in advance. Either way, you can’t spend anything before the agreement is signed.
Is the Rolling lane open now?
Yes. It’s open all year for requests of $50,000 or less, with up to three awards per organization per year. CEO can pause it at any time.
Do I need to own my EVs when I apply?
No. Proof that you own or have ordered the vehicles, such as registrations, purchase orders, or a lease of at least three years, is due with your final reimbursement paperwork.
How long do I have to keep the chargers running?
At least five years from the day they’re energized, networked, and reporting data to CEO. If you sell the site early, you may have to pay back part of the grant.